Append a Bezier curve to the current path.
The point (x1, y1) and the point (x2, y2) are used as the control points
for a Bezier curve and current point is moved to the point (x3, y3).
Return Values
Returns TRUE
on success.
Errors/Exceptions
Throws HaruException
on error.